§ BH:5-3. MATERIAL SPECIFICATIONS.  


Latest version.
  • Every connection required by this chapter shall be made with cast-iron soil pipe from inside the building to a point not less than five feet outside the building. From this point to the sewer main, cast-iron pipe caulked and leaded or asbestos cement pipe with slip-joint rubber gaskets may be used. All pipes must be not less than four inches in diameter.

Ord. No. 4-3-73; 1967 Code § 62B-3